10Side Borrow | Civil Engineering

Please download to get full document.

View again

of 2
All materials on our website are shared by users. If you have any questions about copyright issues, please report us to resolve them. We are always happy to assist you.
Information Report
Category:

Documents

Published:

Views: 11 | Pages: 2

Extension: DOC | Download: 0

Share
Related documents
Description
Specs
Transcript
  SECTION XSIDE BORROW1001 SCOPE When suitable materials from canal eca!ation are not sufficient to form there uire# section of canal emban$ment% roa#&a' emban$ment (es)eciall' at stretches of canal &here both cut an# fill are encountere#*% a##itional suitable materials from thea#+acent si#es of the emban$ment &ithin ,0 meters from the center line of the canal shall be obtaine# b' si#e borro&in- as #irecte# b' the En-ineer. Si#e borro& ma' also be #oneto form the re uire# section of bri#-e abutment a))roaches. The &or$ un#er this Section shall inclu#e clearin- an# -rubbin- an# stri))in- of the to) soil on the si#e borro& area/ eca!ation an# )lacin- or #um)in- of the si#e borro& materials to canal emban$ment% roa#&a' emban$ment or #i$e an# returnin- an#s)rea#in- the stri))e# to) soil after the si#e borro& o)erations.100 ET2OD O3 OPER4TION 4fter ha!in- been #etermine# that materials obtainable from si#e borro& areas aresuitable for emban$ment construction in accor#ance &ith Para-ra)h 50 (b*% these si#e borro& areas shall be cleare#% -rubbe# an# stri))e# to about 10 cm. thic$ to) soil beforestartin- an' eca!ation% )ushin- an# #um)in- o)eration. The cleare# an# -rubbe#materials an#6or stri))e# to) soil shall be )lace# outsi#e the limits of the entire canal ri-ht7of7&a' an# si#e borro& areas as #irecte# b' the En-ineer% all in accor#ance &ith the )ro!isions of Section II% Clearin- an# 8rubbin-.Eca!ation of si#e borro& materials nee#e# for the construction of emban$mentsshall be ma#e more or less uniform in #e)th &ithin the limits sta$e# b' the En-ineer an#shall in no case ecee# a #e)th of 90 cm. measure# from the ori-inal -roun# surface/ a berm of not less than fi!e meters in &i#th shall be left bet&een the outsi#e toe of theemban$ment an# the e#-e of the borro& )it &ith si#e slo)e )ro!isions not stee)er than9:1 or unless other&ise sho&n on the Dra&in-s or as #irecte# b' the En-ineer.aterials from si#e borro& areas shall be )lace# an#6or s)rea# in the canalemban$ment or roa#&a' emban$ment an# subse uentl' com)acte# in accor#ance &ith thea))licable )ro!isions of Section XIII% Emban$ment Construction an# Com)action.Before the Contractor lea!es an' )articular &or$ after com)letion of si#e borro&o)erations% the si#e borro& area shall be rele!ele# an# #estro'e# )a##' #i$es restore#/an# the cleare# an# -rubbe# materials or stri))e# to) soil #e)osite# outsi#e &or$ areashall be returne# an# s)rea# uniforml' throu-hout the borro& area to the satisfaction of the En-ineer. The Contractor shall not be allo&e# to shift his o)eration to another &or$ area unless sai# &or$s are com)lete# an# a))ro!e# b' the En-ineer.1009 E4S;REENT 4ND P4<ENT TS7X71  Section XSi#e Borro&Si#e borro& is a subsi#iar' &or$ for Emban$ment Construction an# Com)action%thus it &ill not be measure# for )a'ment. The cost of &hich is consi#ere# inclu#e# in thecontract unit )rice for Emban$ment Construction an# Com)action or for StructureBac$fill as the case ma'be.TS7X7
We Need Your Support
Thank you for visiting our website and your interest in our free products and services. We are nonprofit website to share and download documents. To the running of this website, we need your help to support us.

Thanks to everyone for your continued support.

No, Thanks