Arsenal Street Bridge project

Please download to get full document.

View again

of 67
All materials on our website are shared by users. If you have any questions about copyright issues, please report us to resolve them. We are always happy to assist you.
Information Report
Category:

Others

Published:

Views: 2 | Pages: 67

Extension: PDF | Download: 0

Share
Related documents
Description
A breakdown of a new project to close the Arsenal Street bridge for repairs.
Transcript
    DRAFT DESIGN REPORT February 2017 Bridge Project P.I.N. 711516 BIN: 1000500 NYS Route 3 over CSX Railroad City of Watertown Jefferson County  i PROJECT APPROVAL SHEET   (Pursuant to SAFETEA-LU Matrix)   A.  IPP Approval: The project is ready to be added to the Regional Capital Program and project scoping can begin. The IPP was approved by: Mark E. Frechette 5/31/12  Acting Regional Director B.  Scope Approval: The project cost and schedule are consistent with the Regional Capital Program. The scope was approved by: Regional Director, Steven G. Kokkoris C.  Public Hearing Certification (23 USC 128):  A public hearing will be held on March 1 st  2017 Project Manager, Jeffrey L. Grill D.  Recommendation for Design Approval: The project cost and schedule are consistent with the Regional Capital Program. Regional Program Manager E.  Recommendation for Design and Nonstandard Feature Approval:  All requirements requisite to these actions and approvals have been met, the required independent quality control reviews separate from the functional group reviews have been accomplished, and the work is consistent with established standards, policies, regulations and procedures, except as otherwise noted and explained. Regional Design Engineer, Robert H. Curtis F.  Nonstandard Feature  Approval: The nonstandard features have been adequately justified and it is not prudent to eliminate them as part of this project. Deputy Chief Engineer G.  Design Approval: The required environmental determinations have been made and the preferred alternative for this project is ready for final design. Deputy Chief Engineer  February 2017 Draft Design Report PIN 7115.16 ii LIST OF PREPARERS Group Director Responsible for Production of the Design Approval Document: Scott A. Docteur, P.E., Regional Planning & Program Management Office, NYSDOT Region 7 Description of Work Performed by Firm: Directed the preparation of the Design  Approval Document in accordance with established standards, policies, regulations and procedures, except as otherwise explained in this document. Note: It is a violation of law for any person, unless they are acting under the direction of a licensed professional engineer, architect, landscape architect, or land surveyor, to alter an item in any way. If an item bearing the stamp of a licensed professional is altered, the altering engineer, architect, landscape architect, or land surveyor shall stamp the document and include the notation altered by followed by their signature, the date of such alteration, and a specific description of the alteration. This report was prepared by the following NYSDOT staff:  David W. Hart, P.E., Project Development, NYSDOT Description of Work Performed:  Directly supervised the preparation of the Design Approval Document in accordance with established standards, policies, regulations and procedures, except as otherwise explained in this document. Jeffrey L. Grill P.E., Project Manager, NYSDOT Description of Work Performed:  Directly supervised the preparation of plans and profiles for the Design Approval Document in accordance with established standards, policies, regulations and procedures, except as otherwise explained in this document.  February 2017 Draft Design Report PIN 7115.16 iii PROJECT APPROVAL SHEET ..................................................................................................................... i LIST OF PREPARERS .................................................................................................................................. ii TABLE OF CONTENTS ......................................................................................................................... iii  –  iv  APPENDICES………………………………………………………………………………………………………...v   CHAPTER 1 - EXECUTIVE SUMMARY ................................................................................................... 1-1   1.1. Introduction ......................................................................................................................................... 1-1   1.2. Purpose and Need .............................................................................................................................. 1-1   1.2.1. Where is the Project Located? ................................................................................................ 1-11   1.2.2. Why is the Project Needed? ...................................................................................................... 1-3   1.2.3. What are the Objectives/Purposes of the Project?.................................................................... 1-3   1.3. What Alternative(s) Are Being Considered? ....................................................................................... 1-3   1.4 How will the Alternative(s) Affect the Environment? ............................................................................ 1-4   1.5. What Are The Costs & Schedules? .................................................................................................... 1-5   1.6. Which Alternative is Preferred? .......................................................................................................... 1-5   1.7. What are the Opportunities for Public Involvement? .......................................................................... 1-6   CHAPTER 2 - PROJECT CONTEXT: HISTORY, TRANSPORTATION PLANS, CONDITIONS AND NEEDS ....................................................................................................................................................... 2-1   2.1. Project History ..................................................................................................................................... 2-1   2.2. Transportation Plans and Land Use ................................................................................................... 2-1   2.2.1. Local Plans for the Project Area ................................................................................................ 2-1   2.2.2. Transportation Corridor ............................................................................................................. 2-1   2.3. Transportation Conditions, Deficiencies and Engineering Considerations ......................................... 2-2   2.3.1. Operations (Traffic and Safety) & Maintenance ........................................................................ 2-2    2.3.2. Multimodal ................................................................................................................................. 2-7    2.3.3. Infrastructure ............................................................................................................................. 2-8    2.3.4. Potential Enhancement Opportunities ..................................................................................... 2-21   CHAPTER 3  –  ALTERNATIVES ............................................................................................................... 3-1   3.1. Alternatives Considered and Eliminated from Further Study .............................................................. 3-1   3.2. Feasible Build Alternatives .................................................................................................................. 3-1   3.2.1. Description of Feasible Alternatives .......................................................................................... 3-1   3.2.2 Preferred Alternative ................................................................................................................... 3-3   3.2.3. Design Criteria for Feasible Alternative(s) ................................................................................. 3-3   3.3. Engineering Considerations ................................................................................................................ 3-4   3.3.1. Operations (Traffic and Safety) & Maintenance ........................................................................ 3-4   3.3.2. Multimodal ............................................................................................................................... 3-10    3.3.3. Infrastructure ........................................................................................................................... 3-10    3.3.4. Landscape and Environmental Enhancements ....................................................................... 3-16    3.3.5. Miscellaneous .......................................................................................................................... 3-16    CHAPTER 4 - SOCIAL, ECONOMIC AND ENVIRONMENTAL CONDITIONS AND CONSEQUENCES 4-1   4.1 Introduction .......................................................................................................................................... 4-1   4.1.1 Environmental Classification ...................................................................................................... 4-1   (IV)   REPLACEMENT, RECONSTRUCTION OR REHABILITATION, AT PRESENT SITE OR IMMEDIATELY ADJACENT THERETO, OF EXISTING BRIDGES, CULVERTS OR OTHER TABLE OF CONTENTS
Recommended
View more...
We Need Your Support
Thank you for visiting our website and your interest in our free products and services. We are nonprofit website to share and download documents. To the running of this website, we need your help to support us.

Thanks to everyone for your continued support.

No, Thanks