Work Programe sample

Please download to get full document.

View again

of 4
All materials on our website are shared by users. If you have any questions about copyright issues, please report us to resolve them. We are always happy to assist you.
Information Report
Category:

Documents

Published:

Views: 6 | Pages: 4

Extension: PDF | Download: 0

Share
Related documents
Description
hehehe
Transcript
  IDTask Mode 작업이름 StartFinishDurationPredeResource Names1  Prelim Mon 16/1/17Sat 29/7/17141 days2 1. Contract with CustomerMon 16/1/17Fri 20/1/175 days 3 2. LED Displays with FrameMon 16/1/17Thu 13/7/17129 days 4Stadium nasionalMon 16/1/17Thu 27/4/1774 days5 2.1 Dismantle Existing LED & FrameMon 16/1/17Thu 27/4/1774 days Dismantle Existing LED/Fram6install scafoldingThu 19/1/17Thu 26/1/176 days7Dismantle existing main frameFri 27/1/17Mon 13/2/1712 days68Install New StructureTue 14/2/17Mon 20/3/1725 days79PaintingTue 21/3/17Thu 30/3/178 days810Erect Scafolding and Clear DebrisMon 3/4/17Fri 14/4/1710 days9112.1.1 Electrical ServicesMon 16/1/17Thu 27/4/1774 days12Dismantle existing cable-national Stadium Tue 31/1/17Tue 14/2/1711 days6FS-4 days,2days,413To supply and install Sub switch board,DB and sub main cableWed 1/3/17Fri 31/3/1723 days1214Testing and commisioningTue 25/4/17Thu 27/4/173 days13152.1.2 Video Signal Infrastructure NetworkMon 16/1/17Wed 22/2/1728 days16Ordering Materil & Delivery at SiteMon 16/1/17Tue 31/1/1712 days17LogisticMon 30/1/17Wed 1/2/173 days18Cabling Instalation WorkWed 1/2/17Wed 22/2/1716 days19Pulling of Cable Optic cable from Control Room to DisplayWed 1/2/17Sat 18/2/1714 days20End to End Fiber Termination with Pigtailsat FTBSat 18/2/17Mon 20/2/172 days21Instalation of Fiber Patch Panels Linking to control roomSat 18/2/17Wed 22/2/174 days22Instalation of FTB at Digital SignageSat 18/2/17Wed 22/2/174 days23Stadium AquaticMon 16/1/17Mon 15/5/1786 days24 2.1 Dismantle Existing LED & FrameMon 16/1/17Mon 15/5/1786 days Dismantle Existing LED/Fram25install scafoldingWed 1/2/17Sat 4/2/174 days26Dismantle existing main frameMon 6/2/17Fri 24/2/1715 days2527Install New StructureMon 27/2/17Fri 31/3/1725 days2628PaintingMon 3/4/17Fri 14/4/1710 days2729Erect Scafolding and Clear DebrisMon 17/4/17Sat 29/4/1710 days28302.1.1 Electrical ServicesMon 16/1/17Mon 15/5/1786 days31Dismantle existing cable-aquatic stadiumMon 13/3/17Wed 22/3/178 days8,27,4Dec '16Jan '17Feb '17Mar '17Apr '17May '17Jun '17Jul '17Aug '17Sep '17Oct '17   작업나눈 작업중요 시점요약프로젝트 요약비활성 작업비활성 중요 시점비활성 요약수동 작업기간만수동 요약 겹쳐서 표시수동 요약시작 날짜만완료 날짜만외부 작업외부 중요 시점마감일진행수동 진행 상황 페이지 1 프로젝트: Schedule_20161223날짜: Mon 23/1/17  IDTask Mode 작업이름 StartFinishDurationPredeResource Names32To supply and install Sub switch board,DB and sub main cableThu 23/3/17Wed 10/5/1735 days3133Testing and commisioningThu 11/5/17Mon 15/5/173 days32342.1.2 Video Signal Infrastructure NetworkMon 16/1/17Tue 28/2/1732 days35Ordering Materil & Delivery at SiteMon 16/1/17Tue 31/1/1712 days36LogisticMon 30/1/17Wed 1/2/173 days37Cabling Instalation WorkWed 15/2/17Tue 28/2/1710 days38Pulling of Cable Optic cable from Control Room to DisplayWed 15/2/17Fri 24/2/178 days39End to End Fiber Termination with Pigtailsat FTBFri 24/2/17Sun 26/2/172 days40Instalation of Fiber Patch Panels Linking to control roomFri 24/2/17Tue 28/2/173 days41Instalation of FTB at Digital SignageFri 24/2/17Tue 28/2/173 days42Hockey Stadium43 2.1 Dismantle Existing LED & FrameMon 16/1/17Thu 25/5/1794 days Dismantle Existing LED/Fram44install scafoldingThu 19/1/17Thu 26/1/176 days45Dismantle existing main frameFri 27/1/17Mon 13/2/1712 days4446Install New StructureTue 14/2/17Mon 20/3/1725 days4547PaintingTue 21/3/17Thu 30/3/178 days4648Erect Scafolding and Clear DebrisMon 3/4/17Fri 14/4/1710 days47492.1.1 Electrical ServicesMon 16/1/17Thu 25/5/1794 days50Dismantle existing cable-Hockey Stadium Tue 31/1/17Tue 14/2/1711 days6FS-4 days,251To supply and install Sub switch board,DB and sub main cableThu 23/3/17Wed 10/5/1735 days5052Testing and commisioningThu 11/5/17Thu 25/5/1711 days51532.1.2 Video Signal Infrastructure NetworkMon 16/1/17Tue 14/2/1722 days54Ordering Materil & Delivery at SiteMon 16/1/17Tue 31/1/1712 days55LogisticMon 30/1/17Wed 1/2/173 days56Cabling Instalation WorkWed 1/2/17Tue 14/2/1710 days57Pulling of Cable Optic cable from Control Room to DisplayWed 1/2/17Fri 10/2/178 days58End to End Fiber Termination with Pigtailsat FTBFri 10/2/17Sun 12/2/172 daysDec '16Jan '17Feb '17Mar '17Apr '17May '17Jun '17Jul '17Aug '17Sep '17Oct '17   작업나눈 작업중요 시점요약프로젝트 요약비활성 작업비활성 중요 시점비활성 요약수동 작업기간만수동 요약 겹쳐서 표시수동 요약시작 날짜만완료 날짜만외부 작업외부 중요 시점마감일진행수동 진행 상황 페이지 2 프로젝트: Schedule_20161223날짜: Mon 23/1/17  IDTask Mode 작업이름 StartFinishDurationPredeResource Names59Instalation of Fiber Patch Panels Linking to control roomFri 10/2/17Tue 14/2/173 days60Instalation of FTB at Digital SignageFri 10/2/17Tue 14/2/173 days61Stadium PutraMon 16/1/17Thu 25/5/1794 days62 2.1 Dismantle Existing LED & FrameMon 16/1/17Mon 13/2/1721 days Dismantle Existing LED/Fram63install scafoldingWed 1/2/17Sat 4/2/174 days64Dismantle existing main frameMon 6/2/17Sat 25/2/1715 days6365Install New StructureMon 27/2/17Fri 31/3/1725 days6466PaintingMon 3/4/17Sat 15/4/1710 days6567Erect Scafolding and Clear DebrisMon 17/4/17Sat 29/4/1710 days66682.1.1 Electrical ServicesMon 16/1/17Thu 25/5/1794 days69Dismantle existing cable Tue 31/1/17Tue 14/2/1711 days6FS-4 days,2days,470To supply and install Sub switch board,DB and sub main cableThu 23/3/17Wed 10/5/1735 days6971Testing and commisioningThu 11/5/17Thu 25/5/1711 days70722.1.2 Video Signal Infrastructure NetworkMon 16/1/17Tue 14/3/1742 days73Ordering Materil & Delivery at SiteMon 16/1/17Tue 31/1/1712 days74LogisticMon 30/1/17Wed 1/2/173 days75Cabling Instalation WorkThu 23/2/17Tue 14/3/1714 days76Pulling of Cable Optic cable from Control Room to DisplayThu 23/2/17Fri 10/3/1712 days77End to End Fiber Termination with Pigtailsat FTBFri 10/3/17Sun 12/3/172 days78Instalation of Fiber Patch Panels Linking to control roomFri 10/3/17Tue 14/3/173 days79Instalation of FTB at Digital SignageFri 10/3/17Tue 14/3/173 days80 2.2 Frame Design & Drawing Mon 16/1/17Fri 10/2/1720 days 81a. On-Site investigationMon 16/1/17Fri 27/1/1710 daysOn-site Investigation82b-1. Structural calculation and design (P10, Perimeter)Mon 16/1/17Fri 10/2/1720 daysStructure Calculation & Design83b-2. Structural calculation and design (P6)Mon 16/1/17Fri 10/2/1720 daysStructure Calculation & Design (P6,Putra stadium)84 2.3 Structure ManufactuingMon 13/2/17Fri 10/3/1720 days82 New Structure Manufacturin85 2.4 ProcurementMon 23/1/17Mon 23/1/171 day 86LED'sMon 23/1/17Mon 23/1/171 dayLED Procurement87Clock systemMon 23/1/17Mon 23/1/171 dayClock Procurement   On-site InvestigationStructure Calculation & DesignStructure Calculation & Design (P6,Putra stadium)New Structure ManufacturingLED ProcurementClock ProcurementDec '16Jan '17Feb '17Mar '17Apr '17May '17Jun '17Jul '17Aug '17Sep '17Oct '17   작업나눈 작업중요 시점요약프로젝트 요약비활성 작업비활성 중요 시점비활성 요약수동 작업기간만수동 요약 겹쳐서 표시수동 요약시작 날짜만완료 날짜만외부 작업외부 중요 시점마감일진행수동 진행 상황 페이지 3 프로젝트: Schedule_20161223날짜: Mon 23/1/17  IDTask Mode 작업이름 StartFinishDurationPredeResource Names88 2.5 LED Display manufacturing and deliveryMon 30/1/17Wed 31/5/1788 days 89Outdoor P10 (JDM) manufacturing for National StadiumMon 30/1/17Fri 10/3/1730 daysLED Manufacture (Outdoor P10) National Stadium90Outdoor P10 (JDM) delivery for National Stadium Mon 13/3/17Fri 24/3/1710 days89Delivery (Outdoor P10) National Stadium91Outdoor P10 (JDM) manufacturing for Aquatic & HockeyMon 13/2/17Fri 31/3/1735 daysLED Manufacturing - Outdoor P10 Aquatic & 92Outdoor P10 (JDM) delivery for Aquatic & HockeyMon 3/4/17Fri 14/4/1710 days91Delivery - Outdoor P10 Aquatic & Hockey93Perimeter (JDM) manufacturingMon 6/3/17Fri 21/4/1735 daysLED Manufacture (Perimeter,National)94Perimeter (JDM) deliveryMon 24/4/17Fri 5/5/1710 days93Delivery (Perimeter,National)95Indoor P6 (Prismview) manufacturing for Putra StadiumMon 30/1/17Tue 18/4/1757 daysLED Manufacture (Indoor P6,Putra)96Indoor P6 (Prismview) delivery for Putra StadiumWed 19/4/17Wed 31/5/1731 days95Delivery (Indoor P6,Putra)97 2.6 Clock system manufacturing and deliveryMon 6/2/17Wed 12/7/17113 days 98clock system manufactuingMon 6/2/17Fri 10/3/1725 daysClock system manufacturing99clock system deliveryMon 17/4/17Mon 17/4/171 dayClock system delivery100clock system installationTue 18/4/17Wed 12/7/1762 days99Clock system installation101 3. Control RoomMon 6/2/17Fri 12/5/1770 days 102Define Soluion RequirementMon 6/2/17Thu 23/2/1714 daysDefine solution requirement103Programming and customizationMon 13/2/17Fri 28/4/1755 days102Customization104Control Room setupMon 3/4/17Fri 12/5/1730 days103Control Room set up105 4. TestMon 8/5/17Fri 2/6/1720 days 106LED display TestingMon 8/5/17Fri 2/6/1720 daysTest (LED display)107Game Operation Solution TestingMon 8/5/17Fri 2/6/1720 daysTest (Game Operation Solution)108 5. Training Mon 12/6/17Fri 23/6/1710 days 109LED Display TrainingMon 12/6/17Fri 23/6/1710 daysTraining (LED display)110Game Operation Solution TrainingMon 12/6/17Fri 23/6/1710 daysTraining (Game Operation Solution)111 6. Game supportMon 22/5/17Sun 24/9/1790 days 112Pre-opening eventMon 22/5/17Fri 26/5/175 daysPre-Opening Event (National Stadium)113SEA Games (8/17~8/31)Mon 14/8/17Fri 1/9/1715 daysSEA Games114Para Games (9/15~9/23)Wed 13/9/17Sun 24/9/179 daysPara Games115 7. Close OutFri 1/9/17Fri 29/9/1721 days 116DocumentationFri 1/9/17Fri 29/9/1721 daysDocumentationLE   D Manufacture (Outdoor P10) National StadiumDelivery (Outdoor P10) National StadiumLED Manufacturing - Outdoor P10 Aquatic & HockeyDelivery - Outdoor P10 Aquatic & HockeyLED Manufacture (Perimeter,National)Delivery (Perimeter,National)LED Manufacture (Indoor P6,Putra)Delivery (Indoor P6,Putra)Clock system manufacturingClock system deliveryClock system installationDefine solution requirementCustomizationControl Room set upTest (LED display)Test (Game Operation Solution)Training (LED display)Training (Game Operation Solution)Pre-Opening Event (National Stadium)SEA GamesPara GamesDocumentaDec '16Jan '17Feb '17Mar '17Apr '17May '17Jun '17Jul '17Aug '17Sep '17Oct '17   작업나눈 작업중요 시점요약프로젝트 요약비활성 작업비활성 중요 시점비활성 요약수동 작업기간만수동 요약 겹쳐서 표시수동 요약시작 날짜만완료 날짜만외부 작업외부 중요 시점마감일진행수동 진행 상황 페이지 4 프로젝트: Schedule_20161223날짜: Mon 23/1/17
We Need Your Support
Thank you for visiting our website and your interest in our free products and services. We are nonprofit website to share and download documents. To the running of this website, we need your help to support us.

Thanks to everyone for your continued support.

No, Thanks